Ice and water shield installed at eaves, valleys, and roof penetrations per applicable IRC provisions and the local code amendment for this climate zone. Coverage at the eave extends a minimum distance inside the interior wall line as required by the adopted code, to address ice damming risk. Code requirement applies to the replacement system regardless of whether the original roof included this material. Verify the applicable IRC section, eave coverage distance, and climate-zone requirements in the code edition adopted in your jurisdiction.
RFG
Roofing
Tear-off to deck
F9
Note Attached
IRC
Existing roof system documented as [X] layer(s) prior to tear-off. All layers removed to the deck per [applicable IRC roofing provisions / local code amendment / manufacturer warranty requirement] for the replacement system. Overlay is not permitted given the existing layer count and substrate condition. Photos of layer count and deck condition included in the claim file.
Verify the applicable IRC section in the code edition adopted in your jurisdiction; section numbers vary between editions.
IRC
Category
Roofing
By
F9 Notes Team
F9 Notes Team
More in Roofing
View All
F9
Note Attached